Error determining the cost estimate
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 078
Message text: Error determining the cost estimate
What causes this issue?
The system cannot determine a cost estimate which the system uses to
proposes the backflushed activity quantities.
There are several causes for this problem.
You define the cost estimate the system is to use to propose the
activity quantities in repetitive manufacturing, in the control
parameters of the repetitive manufacturing profile.
Backflush on the basis of the preliminary costing - product cost
collector
If you have defined, for example, that the backflush is to be carried
out on the basis of a
<DS:GLOS.3526B76FAFAB52B9E10000009B38F974>preliminmary costing</> for a
<DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</>,
you must also have created a preliminary costing for the cost
collector.
Note that you cannot create a preliminary costing for a product cost
collector with the
<DS:GLOS.36F138F91B385A9EE10000009B38F984>controlling level</> "product
cost plant/planning plant".
Backflush on the basis of the standard cost estimate - material
You must have created a
<DS:GLOS.3526B6DFAFAB52B9E10000009B38F974>standard cost estimate</> for
the <DS:GLOS.3526BEB5AFAB52B9E10000009B38F974>material</>.
It must be a <DS:GLOS.3526B719AFAB52B9E10000009B38F974>cost estimate
with quantity structure</>. This standard cost estimate must be flagged
and released.
If a material is to be produced in repetitive manufacturing, you must
set the indicator <DS:DE.SA_SAUFT>Repetitive mfg</> in the MRP view of
the material master record before you create the standard cost estimate
for the material. The system only updates the costs per operation in
repetitive manufacturing if you have set this indicator.
System Response
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
How to fix this error?
In the repetitive manufacturing profile, check what option the system
is to use to propose the activity quantities. It may make sense to
change the existing setting if, for example, you have defined that the
backflush is to be carried out on the basis of the standard cost
estimate but you actually work with a generic cost collector.
Check whether a preliminary costing for the cost collector or a flagged
and released standard cost estimate for the material exists. To do
this, branch to the information system of Product Cost Controlling.
Set the indicator <LS>repetitive mfg</> in the material master record.
If necessary, create the missing cost estimate.
To create a standard cost estimate for the material, branch to the menu
of Product Cost Planning.
To create a preliminary costing for the cost collector, branch to the
menu for Periodic Product Controlling.
Procedure for System Administrators
Error message extract from SAP system. Copyright SAP SE.