Valid to date &1 of assignment cannot lie after the &2
Message type: E = Error
Message class: WRF_ARTICLE_SCREENS - Message for Errors in Material Screens
Message number: 036
Message text: Valid to date &1 of assignment cannot lie after the &2
What causes this issue?
The "Valid to" date &V1& of the assignment lies after the "Valid to"
date &V2& of the node to which you want to assign the material. However,
you can only schedule an assignment until the end date of the node
validity period.
System Response
The system cannot copy the entered assignments.
How to fix this error?
Adjust the "Valid to" date of the assignments in such a way that they do
not lie after the &V2&.
The "Valid to" date was linked using the method
<ZK>VALIDITY_CHECK_FOR_ARTICLE</> of the BAdI <ZK>BADI_MATGRP_HIER_CHK
</>. In the standard system, this linkage is not activated and the check
error will not be issued.
Procedure for System Administrators
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
WRF_ARTICLE_SCREENS035 Valid from date &1 of assignment must not lie before the &2
WRF_ARTICLE_SCREENS034 Valid date date of assignments must be the &
WRF_ARTICLE_SCREENS037 You are not authorized to change the assignment for node &
WRF_ARTICLE_SCREENS038 The interval assignments must not overlap