Date-effective BOM and routing used for production execution

Message type: E = Error

Message class: MPE_SFMASTERISSU_MSG -

Message number: 001

Message text: Date-effective BOM and routing used for production execution



What causes this issue?

Shop floor BOM and routing are not version controlled.


System Response

Date-effective BOM and routing are used for production execution. There
is no need to monitor shop floor BOM versions.


How to fix this error?

If you use date-effective BOM and routing on purpose, then there is no
need to change anything. If you want to use shop floor routings and
version-controlled BOMs, then change the "Use Different Master Data for
Planning and Execution" indicator in the production version.


Procedure for System Administrators

The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


Error message extract from SAP system. Copyright SAP SE.