Date-effective BOM and routing used for production execution
Message type: E = Error
Message class: MPE_SFMASTERISSU_MSG -
Message number: 001
Message text: Date-effective BOM and routing used for production execution
What causes this issue?
Shop floor BOM and routing are not version controlled.
System Response
Date-effective BOM and routing are used for production execution. There
is no need to monitor shop floor BOM versions.
How to fix this error?
If you use date-effective BOM and routing on purpose, then there is no
need to change anything. If you want to use shop floor routings and
version-controlled BOMs, then change the "Use Different Master Data for
Planning and Execution" indicator in the production version.
Procedure for System Administrators
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
MPE_SFMASTERISSU_MSG000 Planned order has no production version
MPE_SAS_MSG062 SAS &1 cannot be unreleased, used in Operation Activity
MPE_SFMASTERISSU_MSG002 Production version is not valid on end date of planned order
MPE_SFMASTERISSU_MSG003 Production version does not cover quantity of planned order